“World Dream” undocked

Today the “World Dream” is undocked at the Meyer Werft site in Papenburg and presented to the public for the first time

Intermediate Engineering was confronted with the question of how oversized drawings can be precisely applied to the side wall of a ship. This question gave rise to the idea of developing a Wallplotter with an upstream workflow. After a little more than 12 months of development, the first productive use took place at the “World Dream”, a ship of the Meyer shipyard, in Papenburg. Parts of the total artwork on the port side were drawn by our development team using the Wallplotter.